Warehouse and logistic

Case Studies

Implementation of Groundwater Monitoring Scheme, Hertfordshire

Client: Pioneer Construction

ADS undertook groundwater and local surface water quality monitoring during dewatering of excavations within aquifers <500m away from potable water abstractions. Strict water quality trigger values were set for each water body. Monitoring included telemetric continuous monitoring of key parameters using aquatrolls, weather monitoring, regular confirmatory low flow sampling of groundwater and water sampling of lakes and streams to demonstrate no adverse impacts by construction.

This project delivered a variety of technological solutions to assure stakeholders that below ground risk was being managed effectively on site. The works were completed within a busy construction period. Stakeholders were updated regularly and the construction activities completed without interruption.

ADS was commissioned to support the contractor to deliver the agreed groundwater and local surface water monitoring plan. All planning
requirements were met and agreement with key stakeholders including the Environment Agency, Thames Water and Affinity Water secured.

Interpretative Site Investigation, Lincoln.

Client: Sure Store

The Challenges: ADS were commissioned to design and complete a geotechnical and geoenvironmental site investigation for a proposed extension of an existing storage units warehouse. The proposed development area comprised an area of concrete hard standing with external storage containers and a known underground surface water drainage network.

ADS undertook of 3 No. window sample boreholes to provide representative geotechnical and geoenvironmental information on the nature of the ground and allow sampling. Dual purpose groundwater and ground gas installations allowed the completion of post fieldwork monitoring.

ADS provided the structural engineers with geotechnical information suitable for foundations design. The relevant planning condition was discharged by the Local Authority.

MKM Builders Merchants : Stoke, Middlesbrough, Chester, Birkenhead, Louth, Cheltenham, Lincoln, Stafford & Carlisle

Developer: Various
Architect: C4 Projects
Main Contractor: Various​

Developments of steel portal frame warehousing units circa 25000 sq ft. ADS Structural provided the structural and civil design for the superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards and SUDS drainage system. Our in-house design teams were heavily involved in the technical design of the sub and superstructures liaising with the geotechnical engineers throughout the site investigation processes and determining foundation solutions which were generally simple shallow pads, occasionally recommending the implementation of ground improvement via dynamic compaction / lime stabilisation / vibro piling. ADS Civils design team also prepared SUDS assessments and detailed drainage strategies to support the planning applications and such gained valuable experience in dealing with the LLFA, water authorities & drainage bodies.

Manor Point : Holmes Chapel

Developer: Aus Bore
Architect: C4 Projects
Main Contractor: Pioneer Design & Build​

Development of steel portal frame light industrial / commercial units. ADS Structural provided the structural and civil design for the superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy duty access road, section 278 agreements and SUDS drainage system, including the design and specification of a culvert diversion.

Prologis Coventry

Developer: Ashford Developments
Architect: Web Gray
Main Contractor: Pioneer Design & Build

Development of 2No. steel portal frame warehouses, circa 40,000 sq ft, ADS Consult provided the structural and civil design for the superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy duty access road and SUDS drainage system.

Total Park Atherstone

Developer: Total Developments
Architect: C4 Projects
Main Contractor: Pioneer Design & Build

Development of a steel portal frame warehouse, circa 140,000 sq ft, ADS Consult provided the structural and civil design for the superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy duty access road and SUDS drainage system including balancing ponds, SUDS swales and permeable parking areas.

Contact Us

To discuss your aspirations of extending your home, complete the form below. A member of the ADS Structural team will make contact within 1 working day.

Get In Touch