Developer: Ashford Developments
Architect: Web Gray
Main Contractor: Pioneer Design & Build
Development of 2No. steel portal frame warehouses, circa 40,000 sq ft, ADS Consult provided the structural and civil design for the superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy duty access road and SUDS drainage system.