Warehouse and Logistics
- Home
- Warehouse and Logistics
MKM Builders Merchants : Stoke, Middlesbrough, Chester, Birkenhead, Louth, Cheltenham, Lincoln, Stafford & Carlisle.
Developer: Various
Architect: C4 Projects
Main Contractor: Various
Architect: C4 Projects
Main Contractor: Various
Developments of steel portal frame warehousing units circa 25000
sq ft. ADS Structural provided the structural and civil design for the
superstructure frame, secondary steelwork, masonry wall panels, GF
Slabs, foundations, concrete external storage yards and SUDS
drainage system.
Our in-house design teams were heavily involved in the technical
design of the sub and superstructures liaising with the geotechnical
engineers throughout the site investigation processes and determining foundation solutions which were generally simple shallow
pads, occasionally recommending the implementation of ground improvement via dynamic compaction / lime stabilisation /
vibro piling. ADS Civils design team also prepared SUDS assessments and detailed drainage strategies to support the planning
applications and such gained valuable experience in dealing with the LLFA, water authorities & drainage bodies.
Manor Point : Holmes Chapel
Developer: Aus Bore
Architect: C4 Projects
Main Contractor: Pioneer Design & Build
Architect: C4 Projects
Main Contractor: Pioneer Design & Build
Development of steel portal frame light industrial / commercial units. ADS Structural provided the structural and civil design for the
superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy
duty access road, section 278 agreements and SUDS drainage system, including the design and specification of a culvert
diversion.
Kirk Sandall Industrial Estate, Doncaster :
Developer: Citrus Group
Architect: AJA Architects
Main Contractor: Magna Projects
Architect: AJA Architects
Main Contractor: Magna Projects
A purpose built portal frame warehouse facility in Doncaster. ADS
Structural were appointed as project civil and structural engineers for
the novation works, providing the structural and civil design for the
superstructure frame, secondary steelwork, masonry wall panels, GF
Slabs, foundations, concrete external storage yards, heavy duty
access road, SUDS drainage system including a packaged pumping
station, 3d cut/fill modelling and external levels.
Manor Point : Holmes Chapel
Developer: Aus Bore
Architect: C4 Projects
Main Contractor: Pioneer Design & Build
Architect: C4 Projects
Main Contractor: Pioneer Design & Build
Development of steel portal frame light industrial / commercial units. ADS Structural provided the structural and civil design for the
superstructure frame, secondary steelwork, masonry wall panels, GF Slabs, foundations, concrete external storage yards, heavy
duty access road, section 278 agreements and SUDS drainage system, including the design and specification of a culvert
diversion.